SPECTRUM Report Manager scheduled report failed with error: "Information is needed before this report can be processed".

Document ID : KB000051810
Last Modified Date : 14/02/2018
Show Technical Document Details

Description

A SPECTRUM Report Manager scheduled report can fail when parameter values are not saved.

Solution

Evidence of the failed scheduled report:



Figure 1



Even if all the parameter values are specified on Schedule page, you must click the [Set Parameter Value] button to save the parameter values.

Figure 2