Remote job log not purged in DQM with remote physical queue

Document ID : KB000084699
Last Modified Date : 14/04/2018
Show Technical Document Details
Issue:
Error Message :
N/A

In a DQM configuration with a local generic queue (submission) and remote physical queue(s) (execution) the job log is not purged on the remote node.

In a scenario where the physical queues are local the job log is purged at the same time as the entry in the launch files according to the variables
<X|S|I|A>_O_PURGE_* (e.g. X_O_PURGE_HST_RET_E).

In the remote case no purge is taking place.
Environment:
OS: All
OS Version: N/A
Cause:
Cause type:
Defect
Root Cause: This is an omission
Resolution:
Update to a fix version listed below or a newer version if available.

Fix Status: Released

Fix Version(s):
Dollar Universe 6.9.01 - Available
Additional Information:
Workaround :
The remote job logs have to be removed manually or using a script.