Newly created Risk has Response Strategy populated from an existing Risk

Document ID : KB000106781
Last Modified Date : 16/07/2018
Show Technical Document Details
Issue:
Newly created Risk has Response Strategy populated from an existing Risk. 

Steps to Reproduce: 
1. Select a program 
2. Select the Risks/Issues/Changes tab 
3. Click on New (to create a Risk) 
4. Enter required fields: Risk name and Risk ID, Response Type 'Watch', and Save. 
5. Select 'Response Strategy' from the newly created Risk's Properties tab. 
6. Enter a long Response Strategy 
7. Enter a value for 'Assigned To' 
8. Click Add 
9. Get error 'Value contains illegal UTF-8 characters. Value is too large.' 
10. Reduce the number of characters in Response Strategy 
11. Click Add, and the Risk is created. 
12. Repeat step 3 to 5. 

Expected Result: Response Strategy is blank on the newly created Risk. 
Actual Result: Response strategy contains the long value (from step 6) which resulted in error Value is too large. 
Environment:
CA PPM release 15.1
Resolution:
This is defect DE41153, and is fixed in CA PPM release 15.5.