JSCH Monitor: Incorrect status icon when active JOBS task cancelled manually

Document ID : KB000087275
Last Modified Date : 14/04/2018
Show Technical Document Details
Issue:
Error Message :
N/A

When a Jobs object is (1) executed via Schedule object and (2) cancelled manually during runtime, the icon in the Schedule Monitor is not updated.
It continues to indicate that the Task is active (green), even though the text of the status is correct (ENDED_CANCEL).


0EMb0000001QYXc.png

The icon should be red (for Cancelled).


 
Environment:
OS Version: N/A
Cause:
Cause type:
Defect
Root Cause: Incorrect icon is displayed.
Resolution:
Update to a fix version listed below or a newer version if available.

Fix Status: Released

Fix Version(s):
Component: UserInterface of Automation Engine

Automation Engine 12.1.0 – Available
Automation Engine 12.0.2 – Available
Automation Engine 11.2.4 – Available
Additional Information:
Workaround :
Check the text of the status at the right of the icon to determine the correct status.