Is there a way to change the allocations for multiple team members aside from manually updating the allocations in PPM?

Document ID : KB000121073
Last Modified Date : 27/11/2018
Show Technical Document Details
Question:
Is there a way to update the allocations (particularly for Non Project Investment Objects (NPIOs) such as Other Work) aside from manually changing the allocations for each team member on the Team tab in PPM? 
Answer:
One option would be using XOG to update multiple team members at the same time. See KB000012621 for details on the XOG template that can be used.