Is there a CA 7 command or report show the average duration of each run?

Document ID : KB000015354
Last Modified Date : 14/02/2018
Show Technical Document Details
Question:

Is there a CA 7 command or report show the average durations of each run?

Answer:

You can run a (HR04) or (HR05) to capture the elapsed time of jobs within a specific time frame. This is the 'Scheduled vs Actual Job Report SASSHR04, or Scheduled vs Actual Stations Report.'  This information is in report format only.  Additionally, the LJOB,JOB=XXXXXXXX,LIST=ALL can be entered to capture the average RUN-TIME of a job.  CA 7  calculates the last 6 runs of a job for a running average.

Additional Information:

For additional information, please refer to:  https://support.ca.com/cadocs/7/CA%20Workload%20Automation%20CA%207%20Edition%2011%203-ENU/Bookshelf_Files/HTML/WA_SE_ReportRef_ENU/index.htm