How to copy PROGRAMs and TASKs during an upgrade.

Document ID : KB000010193
Last Modified Date : 14/02/2018
Show Technical Document Details
Introduction:

One of the Post-Configuration Tasks for an upgrade configuration is to “Copy the tasks and programs from System 99 to your specified DC system”.

How do I do this?

Background:

This is one of the documented steps in an upgrade configuration.

Environment:
CA-IDMS, all supported releases.
Instructions:

This must be done with an RHDCSGEN batch job step (System Generation in batch).

Use the RHDCSGEN batch job step in JOB17 of the configuration process as a sample.

Replace the SYSIPT with this:

//SYSIPT   DD *
       SIGNON DICTIONARY SYSTEM.
       ICTL=(1,72)
       COPY PROGRAMS FROM SYSTEM 99 TO nnn.
       COPY TASKS    FROM SYSTEM 99 TO nnn.
       GENERATE.                                 

Change the nnn to the system number of your CA-IDMS CV. This is what you set GJDCSYS to in VARBLIST, and is also the number displayed after the V in the ENTER NEXT TASK CODE: prompt.

 

Run the job step and then cycle the CV to bring in the new PROGRAMs and TASKs.

Additional Information:

For more information, see the following CA IDMS DocOps page:

 

Creating an Executable System