How can I start CA TPX with an alternate SMRT or SAMT without changing the PROC?

Document ID : KB000073105
Last Modified Date : 29/03/2018
Show Technical Document Details
Question:
How can I start CA TPX with an alternate SMRT or SAMT without changing the PROC?
Environment:
CA TPX for z/OS
Answer:
You can start the CA TPX task with parms to override any of the parameters defined in the TPX PROC such as SMRT=xxx,SAMT=xxx: 

S TPX,SMRT=SMRTSAF,SAMT=SAF 

This saves having to RELOAD in TPXOPER, especially since some SMRT parameters cannot be reloaded.