Creating a new parallel UIM environment

Document ID : KB000093004
Last Modified Date : 01/06/2018
Show Technical Document Details
Introduction:
There is a need to rebuild the UIM environment to start with a clean UIM database.  How can we bring over the robots from the old domain to the new domain?
Environment:
UIM 8.51
 
Instructions:
Using the Infrastructure Manager client while connected to the original primary domain and hub, create a package for the robot. cfx config that includes the following:
<controller>overwrite
   domain = newDomain
    hubip = hub ip address
    hub = newHubName
    hubrobotname = newHubRobotName
</controller>

Drag the package to each robot.
Once complete, use "Remove Robot" in the original environment.
Connect to the new primary hub using Infrastructure Manager.
Verify you see the robot in the new domain.