Calendar replacement: Keywords not updated in Schedule Task properties

Document ID : KB000087780
Last Modified Date : 14/04/2018
Show Technical Document Details
Issue:
Error Message :
N/A

When replacing an old Calendar and a keyword through the context menu, only the Calendar field is updated in the schedule. The keyword itself remains unchanged. This requires a manual update to resolve.

Investigation: 

1. Create a JSCH with a Job in it. 
2. Create 2 Calendars that each have a unique keyword name 
3. In the Task properties of the Job in the Schedule, assign the first Calendar and its keyword. 
4. Right-click on the first Calendar and do a replace 
5. Replace the first Calendar with the second Calendar and the new keyword. 
6. Observe the Schedule: The Calendar was updated but not the keyword.

Cause:
Cause type:
Defect
Root Cause: Calendar object could not be replaced with another Calendar in the properties of a Schedule.
Resolution:
Update to a fix version listed below.

Fix Status: Released

Fix Version(s):
Automation Engine 12.0.0 - Available
Automation Engine 11.2.2 - Available
Automation Engine 11.1.5 - Available
Additional Information:
Workaround :
Open the object which uses that Calendar and keyword. Update the keyword to the new keyword name manually.