CA PPM: Project Status Report List Does Not Return Results

Document ID : KB000110083
Last Modified Date : 08/08/2018
Show Technical Document Details
Issue:
The Project Status Report List report does not return any results when filtering for specific projects. 
Resolution:
The project will not be included in the report results if the 'Status Reporting' field on the project is blank. The 'Status Reporting' field uses a lookup with the values: Not Required, Optional, Required. 

Once a value is selected on the project, and the Load Data Warehouse job runs, the project will show up on the results of this report.