CA JOBTRAC JM r11 Procedure to Delete/Purge an event from the schedule when DELETE/PURGE commands fail

Document ID : KB000051547
Last Modified Date : 14/02/2018
Show Technical Document Details

Description:

Procedure to remove an event that is stuck with status (IN PROGRESS, EXECUTING, AWAIT-EXEC or ABENDED=SYS).

Solution:

The following procedure can be used for events that are stuck with status (IN PROGRESS, EXECUTING, AWAIT-EXEC or ABENDED=SYS).

  1. Select the job with a '@' to recycle status.
  2. Select the job with a 'P' to purge it (this may need to be done twice).