C_PERIOD Object execution not successful because logical date set to '00000000'

Document ID : KB000085091
Last Modified Date : 14/04/2018
Show Technical Document Details
Issue:
Error Message :
U00007026 '' activation is processed with the logical date '00000000'.

After Stopping a C_PERIOD Object and setting it to GO again, the first run is not successful. 

The logical date is always set to '00000000'', which leads to the above error message in the Activation Report.

 
Environment:
OS Version: N/A
Cause:
Cause type:
Defect
Root Cause: Wrong logical date in periodic object with option "GAP". Activate-period-job in jpexec_r sets the ldatum (and rdatum) fields of AKTX to EH_NextCheck. EH_NextCheck was set to NULL when the period was stopped.
Resolution:
Update to a fix version listed below or a newer version if available.

Fix Status: Released

Fix Version(s):
Automation Engine 12.1.0 - Available
Automation Engine 12.0.2 - Available
Automation Engine 11.2.5 - Available
Additional Information:
Workaround :
N/A