BVS server process goes to 100%

Document ID : KB000085560
Last Modified Date : 14/04/2018
Show Technical Document Details
Issue:
Error Message :
No error messages

Patch level detected:Dollar Universe 6.1.00
Product Version: Dollar.Universe 6.1.0

Description :Job Chains are not updated or with a delay of minutes (upto 15 or even more)
BVS engine is at 100 % CPU al the time
This issue is most likely to happen with a large set of Job Chains (>100) and when the Job Chains and monitored Uproc are on remote servers
Environment:
OS: All
Cause:
Cause type:
Defect
Root Cause: After the initial loading of CDJ infos, the BVS server tries to listen on the network; if the initial loading was too long, the function to listen on the network would have a negative timeout.
Resolution:
Update to the fix version listed below or a newer version if available.

Fix Status: Released

Fix Version(s):
Component: Application.Server
Version: Dollar.Universe 6.2.01
Additional Information:
Workaround :
N/A