AWI Schedule Task numbering missing

Document ID : KB000084748
Last Modified Date : 14/04/2018
Show Technical Document Details
Issue:
Error Message :
N/A

The task number is not visible on the task list in schedules.

When searching for usage of an object (Search for use) in the AWI / Process Assembly, which is part of a schedule object, the search results shows the “Task number”.

However, when the resulting schedule is opened the task list contains no indication as to which task contains the result of the previous search.
 
0EM0N000001hq7g.png

The “Used in” field indicates the Task number, which is the sequence  of  the schedule task, by adding (i.e. Task (1) which signifies the first task of the schedule).
This makes it hard to find when the schedule contains numerous tasks or the tasks have long names that are similar.
0EM0N000001hq7v.png
 
0EM0N000001hq8F.png
Cause:
Cause type:
By design
Root Cause: The task list of schedule objects doesn't contain the task number.
Resolution:
Update to a fix version listed below or a newer version if available.

Fix Status: In Progress

Fix Version(s):
Automic Web Interface 12.2.0 - Planned release date: 2018-06-29
Additional Information:
Workaround :
Use the search function of the browser to find the task in the schedule list.              
 
  0EM0N000001hq85.png