Are there any CA Endevor reports that identifies all of the code released to production environment?

Document ID : KB000015730
Last Modified Date : 14/02/2018
Show Technical Document Details
Introduction:

The external Auditors want a report of all the programs and code that has been moved into the Production system within the last 30 days. 

Question:

Are there any CA Endevor reports that identifies all of the code released to production environment?

Environment:
z/OS
Answer:

The MCF CONRPT04 report can be used to list all element activity in the Production Environment within the last 30 days.

Use the BC1JRPTS JCL in the CSIQJCL library with the following BSTINP control cards:

 
//BSTINP   DD *        
REPORT 04.             
ENVIRONMENT PROD.      
SYSTEM *.             
SUBSYSTEM *.           
ELEMENT *.             
TYPE *.                
STAGE *.               
DAYS 30 .              
SEARCH MAP.            
 
 
Additional Information:

For more information on running the Endevor Master Control File reports, go to the CA Endevor DocOps site ---  

•  Logon using your email address and CA Support Online password

•  In the Select Product drop down box, search for Endevor and select the appropriate version

•  In the Table of Contents on the right, go to :

+ Reporting

+ CA Endevor SCM Reports

>> Master Control File Reports

>> CONRPT04 Element Activity Profile