Task shown running twice in a Production Plan workload forceast

Document ID : KB000086032
Last Modified Date : 14/04/2018
Show Technical Document Details
Issue:
Error Message :
N/A

Patch level detected:Univiewer Console 4.0.00
Product Version: Dollar.Universe 6.0.0

Description :When the workload forecast for the Production Plan, which has 2 Job Chains containing exactly the same task, is generated; the task is shown twice running for the same day.

# How to reproduce the behavior:
-Create 2 business views with the same tasks and deploy them. Two Job Chains will be created.
-Create a Production Plan with the 2 job chains.
-Perform a workload forecast on the Production Plan.
Environment:
OS: All
OS Version: ALL OS
Cause:
Cause type:
By design
Root Cause: This is a normal behavior since there are two defined Job Chains containing exactly the same tasks in one Production Plan.
Resolution:
This is a normal behavior since there are two defined Job Chains containing exactly the same tasks in one Production Plan.

Fix Status: No Fix

Additional Information:
Workaround :
N/A