Exception periods not calculated correctly if one is inclusive of another

Document ID : KB000085161
Last Modified Date : 14/04/2018
Show Technical Document Details
Issue:
Affects Release version(s): 5

Error Message :
There is no error message

Patch level detected:Dollar Universe 5.6
Product Version: Dollar.Universe 5.6.0 FX25010

Description :If 2 exception periods are created in 1 task, 1 period is inclusive of the other one, the calculator will calculate launches without considering the included exclusion period definition.
Environment:
OS: All
OS Version: All
Cause:
Cause type:
Defect
Root Cause: N/A
Resolution:
This issue is corrected in versions 6.0.15 and above of Dollar Universe.

Fix Status: Released

Fix Version(s):
Component: Application.Server
Version: Dollar.Universe 6.0.0
Additional Information:
Workaround :
Make sure there is no exception overlaying another exception